Examples of Industrial Projects The following products were all engineered by Badencorp based on strict customer requirements and adherence to standards. |
|
|
The HUMVEE Egress Assistance Trainier (HEAT) was completely designed and fabricated in a 90 day period to exacting military requirments. All aspects of the design from structure to circuit design were don eby Badencorp. To see more on this project click this link |
|
The CLOUD-9 Bicycle seat features a large plastic injection molded seat with integrally molded support rods. The seat is then covered by injected foam and finally covered by a vinyl material. |